The Solid Wood Flooring Company Logo
Search Icon
Basket Icon
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
product
news
architects
contractors
tech
video
post
case
page
Filter by Categories
The Solid Wood Flooring Company Logo
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
product
news
architects
contractors
tech
video
post
case
page
Filter by Categories
Case Studies

Antique Fumed Chevron Parquet Engineered Wood Flooring 60 degree chevron oiled finish

Project: Battersea Power Station

Antique Fumed Chevron Parquet Engineered Wood Flooring 60 degree chevron oiled finish

Originally specified for phase two of the Battersea Power Station project we are now fitting this in Parker Tower Convent Garden London. Ramos Catarino are the fit out contractor and because this is a small chevron with a 60 degree angle they are using our professional fitters.

These are apartments and site conditions are always difficult because of the number of different trades working at the same time.

The finish of all our engineered wood flooring is resilient enough to withstand this and all that is needed is a good clean using the latest soap oils. The images below show the different areas and stage of the installation.

The edges of each piece are slightly antiqued and the surface is brushed to add texture.

Setting out is the most the most crucial part of any installation. These site conditions are not perfect and there is still painting to be done and electrical work. In normal circumstances this would not be advisable but when large projects require a fit-out schedule to be met we are left with little choice. Please do not do it this way if it is your home.

Contact Us

Get in touch

Questions or comments? If you can’t find the answer to your question on our site or want to leave some feedback, please fill in the form below.