The Solid Wood Flooring Company Logo
Search Icon
Basket Icon
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
product
news
architects
contractors
tech
video
post
case
page
Filter by Categories
The Solid Wood Flooring Company Logo
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
product
news
architects
contractors
tech
video
post
case
page
Filter by Categories
News Story

The Timeline for Installing Your New Wood Flooring: From Selection to Completion

15/04/2024

A Comprehensive Guide to Planning and Execution of Your Flooring Project

The wood flooring installation process typically spans 4 to 10 weeks, encompassing pre-installation preparation, material selection, ordering, installation, drying, and post-installation care. Factors such as project size and complexity can influence the duration of each step.

Step 1: Pre Wood Flooring Installation Preparation

Preparing your space for wood-flooring installation is the first crucial step to make sure you receive a successful and long-lasting result.

This phase involves several key tasks:

  1. Clearing the Space: Remove any existing flooring materials, like carpet, tile, or laminate, for a smoother installation process.
  2. Subfloor Inspection and Repair: Check for uneven surfaces, moisture issues, or structural problems. Addressing issues before proceeding is important to prevent future problems.
  3. Subfloor Preparation: Proper prep allows a solid foundation for the wood flooring to be installed, reducing the risk of issues such as squeaking or buckling later on.
  4. Acclimating the Wood Planks: Wood is a natural material that can expand or contract based on temperature and humidity levels. By allowing the planks to acclimate to the space for a period of time before installation, you can minimise possible warping or gaps after installation.

Step 2: Material Selection

Whilst the preparation is happening, it could be a good time to finalise your material and finishes.

It’s important to weigh up different options and their possible pros and cons to make sure that you are making the best choice for your space.

1. Wood Species:

Each species has its own quirks, from colour and grain patterns to hardness.

As there is something out there for everyone, carefully consider the ambience you want to create.

It’s also worth noting that different wood types will age differently, especially in high-traffic areas.

2. Finish Options:

The finish of your wood flooring is a big factor when it comes to appearance and maintenance requirements.

Choose between various finish options – oil-based or water-based polyurethane finishes – which all offer different levels of sheen and protection.

Additionally, you could opt for pre-finished wood flooring, or unfinished flooring for custom staining and finishing on site.

3. Plank Size:

The size of wood planks can significantly impact your space’s overall look and feel.

Larger or wider planks tend to create spaciousness and continuity, particularly in open-plan areas. Narrower planks can lend a more traditional or rustic aesthetic.

Consider the scale of your room, architectural features, and personal preference when choosing a plank size that complements your design vision.

Step 3: Ordering and Delivery

After spending some time selecting the ideal wood flooring for your space, the ordering process can commence.

It’s relatively straightforward and doesn’t take too long.

  1. Place your order: Provide accurate measurements of the area to be covered to ensure you order the correct quantity and kind of materials.
  2. Arrange delivery: Coordinate a delivery date and time that aligns with your project timeline and availability. Keep in mind that factors such as location, accessibility, and the size of your order may impact the delivery logistics.
  3. Anticipate potential delays: Factors such as inventory availability, transportation logistics, or unforeseen circumstances can impact the timeline. When planning your project schedule, build in some buffer time to account for unexpected delays and avoid unnecessary stress.
  4. Monitoring the delivery timeline: Knowing when your wood flooring materials will arrive allows you to plan accordingly and keep the installation process as scheduled.

Step 4: Installation Process

When your materials finally arrive, the professionals can get to the wood flooring installation.

It’s a phase that requires attention to detail and precision to achieve optimal results.

Take your time, follow any guidelines, and enjoy the satisfaction of seeing your vision come to life as your wood flooring takes shape before your eyes.

Step 5: Drying and Curing

After the wood flooring installation is complete, leave it to cure before reintroducing furniture and foot traffic.

This involves giving the adhesives or finishes used during installation adequate time to set and harden.

Rushing this process can compromise the integrity of the installation and may result in issues such as adhesion failure or finish imperfections.

Depending on the type of adhesive or finish used, drying and curing times can vary, ranging from a few hours to several days.

It’s worth the wait.

The Expected Timeframes: Wood Flooring Installation

Step 1: Preparation:

  • Clearing the Space: 1-2 days, depending on the size and complexity of the area.
  • Subfloor Inspection and Repair: 1-2 days; additional time may be needed for more extensive repairs.
  • Subfloor Preparation: 1-2 days, allowing time for levelling compounds or moisture barriers to cure.
  • Acclimating the Wood Planks: 3-7 days, depending on the manufacturer’s recommendations and environmental conditions.

Step 2: Material Selection:

  • Research and Selection: 1-2 weeks to explore options, visit showrooms, and consult with experts.
  • Decision-making: 1-2 days to finalise the choice of wood species, finish options, and plank size.

Step 3: Ordering and Delivery:

  • Placing Your Order: 1-2 days to finalise the order and provide necessary information to the supplier.
  • Arranging for Delivery: 1-2 weeks for scheduling delivery, depending on supplier availability and location.
  • Anticipating Potential Delays: Build in an extra 1-2 weeks to account for any unforeseen delays in shipping or inventory.

Step 4: Installation Process:

  • Preparing the Workspace: 1 day to clear the area and organise materials.
  • Laying the First Row: 1-2 days to lay the first row and ensure proper alignment.
  • Continuing the Installation: 3-5 days, depending on the size of the area and complexity of the pattern.
  • Completing the Finishing Touches: It will take 1-2 days to cut and fit the remaining planks, install the trim, and complete any final adjustments.

These time frames are approximate and may vary depending on various factors, such as the project’s size, the installation’s complexity, and individual circumstances.

Ready to elevate your space with timeless elegance and durability?

Contact us today at The Solid Wood Flooring Company to explore our exquisite selection of wood flooring options. Whether you’re renovating your home or starting a new construction project, our team of experts is here to guide you every step of the way. Schedule a consultation now, and let us help you transform your vision into reality.