Army Museum London | Case Study

Project Details

Project: Army Museum London | Case Study

The designers who did the Army museum refurbishment used our band saw CH E780 wide board 240mm to clad the walls. The images below show where they were installed.

You can clad ceilings and walls with our engineered wood flooring as long as a special coat of fire-retardant finish is applied. The CH E780 is finished with a commercial UV cured special oil that is more like a lacquer but very mat.

Image Image

Please see below for the product used on this project and call us on  01666 504015 for any other information

Download the Solid Wood Flooring App

For all your flooring needs

App Store
App Store Google Play
Contact Us

Contact Us

Questions or comments? If you can’t find the answer to your question on our site or want to leave some feedback, please fill in the form below.